What is the current average turn in time for SMP Beta Work units on average per remaining time left? Eg. 25% are turned in with >75% of the time left. %50 of WU are turned in with >%50 left etc.
Does running a Dual Core processor (or VM) hurt the data needed for the SMP project?
Please do not refer me to the Wiki. Pretty much all the links in it are now dead since the other forum appears to be gone. My preference in answers would be yes or no. and data to back it up. Trying to be specific.
I want to know if my 3 SMP Dual Core setups are hurting more than they are helping. Thanks!
