Project 4756 (Run 4, Clone 919, Gen 1)

Posted: Sat Apr 03, 2010 6:05 pm
by checka
I have a 4890 card(XP64) that has finished 498 consecutive units with out a problem. Now it has been shut down 3 times as unstable on project 4756 on the two identified work units. I received Run 8 14 straight times without the server changing to a different project. I have been told in a prior post that the server is supposed to move on to another unit after striking out 6 times. That isn't working apparently.

The second 4890 on the same PC is running 4756 (Run 0 clone 847, Gen 2 ) with no hitches so far. 16%

Add Run 7 Clone 911 Gen to the problem list . 1% complete then NANs appear. No the card isn't overheating 46C CPU is 38C. Server 171.64.65.103 is also common to this .

19:57 UT reassigned to 5744 and everything seems to be running normally

Re: Project 4756 (Run 4Clone 919, Gen1; Run 8 Clone 620, Gen 5)

Posted: Sat Apr 03, 2010 11:04 pm
by bruce
I can't put (Run 8 Clone 620 Gen 5) on the bad WU list because it has already been completed successfully by someone else.
WU (P4756 R8 C620 G5) was added to the stats database on 2010-04-03 14:04:03 for 477 points of credit.

Please post FAHlog showing each of the errors that were involved, including the startup and ending of at least one run per WU. Also, describe your hardware and software environment (including the driver version number and the values for any Env Variables that you may have set).